TICT orders new cranes to boost efficiency in Lagos port
By Fredrick Wright
The Tincan Island Container Terminal Limited (TICT) has ordered two eco-efficient Konecranes Gottwald ESP.8 Mobile Harbor Cranes to boost efficiency at Lagos port.
Booked at the end of 2021, for delivery in June 2022, it is the first order of a Generation 6 crane for Africa. The company placed the order to support its container traffic development and eradicate congestion at Lagos port.
Managing Director of TICT, Etienne Rocher, said: “The cranes will provide improved handling capacity to meet the demands of the steadily growing business. We look forward to the additional features the Generation 6 will bring, such as the possibility of electric operation in the future”
Regional Sales Manager for Konecranes Port Solutions, Andreas Czwalinna, said: “This order shows the strength of our long-term partnership with TICT. With a total of twelve Konecranes Gottwald Mobile Harbor Cranes in their fleet, as well as RTGs and reach stackers from Konecranes, TICT will have the terminal capacity and flexibility to handle containers from almost any kind of vessel,”
The cranes on order are Konecranes Gottwald ESP.8 Mobile Harbor Cranes, with a working radius of 54 m and a capacity of 150 t. The natural successor to the Generation 5 cranes already on-site, they feature strong lifting capacity curves for improved performance and a higher classification, which doubles their service life in container handling operations. The cranes have a customized propping base adapted to local conditions, as well as a tower extension to reach higher container stacks and a better view of the vessel for improved precision and safety. Built-in readiness for an external power supply will make conversion to electric operation easy when resources allow.